Our Environment, Our Future

Roads and Infrastructure

תמונות מתחלפות 1

Connecting the Carmel Tunnels to Highway 2

Highway 2 at the Entrance to Haifa
2006-2008
Developer: Yefeh Nof
Scope of Project: NIS 26 million
Approximate length: 1.5 kilometers
 
This project included the paving and completion of road links and intersection geometries of the western entry and exit lanes of the Carmel Tunnels and the widening of Highway 2 and Highway 4. It also called for the arrangement of intersections and traffic lights, the extension of water culverts and the organization of overpass water runoff systems
 
Green elements:
The use of local fill materials, the use of recycled construction materials for filling structures, transplanting trees for conservation.