Ben Gurion Airport Railway Bridge

The Airport, Lod
2004-2007
Developer: Israel Railways
Bridge Paving Area: 8,300 square meters

Four railway bridges for a pair of parallel railway lines 1.2 kilometers in length. The two bridges over the Ayalon channel were constructed using the “balanced cantilever” method and the bridges over Highway 1 were constructed using the incremental launching bridge method and incorporating prestressed prefabricated beams cast on site.