Our Environment, Our Future

Geotechnical Engineering Projects - Cementcal

תמונות מתחלפות 1

Rambam Medical Center

Haifa
2009-2011
Developer: The Friends of Rambam
Medical Center

Performing excavation works, shoring and dewatering operations, including the construction of a dewatering system comprising about 85 wells and about twenty submersible pumps along one thousand meterlong water collection channels , at a flow rate of approximately 15,000 cubic meters per hour.