Our Environment, Our Future

Roads and Infrastructure

תמונות מתחלפות 1תמונות מתחלפות 2

The Kessem Interchange

2000-2002
Developer: Derech Eretz
Scope of Project: NIS 160 million
 

In the framework of the construction of the central section of the Cross-Israel Highway, the Kessem Interchange – the key interchange on the route was
constructed. The interchange works included complex earthworks from treatment and sealing of the fat clay subgrade, the construction of five bridges, including beam and segmental bridges, to paving works and extensive landscaping.

Green elements:
The collection of geophytes before the start of the project and replanting them on completion. Collection and signposting of topsoil material. Setting up central “stations” for washing down concrete mixers.