Holon East Interchange, Highway 4

Holon
2009-2011
Developer: The Israel National Roads Company Ltd (Ma’atz)
Scope of Project: NIS 80 million
Approximate length: 3.5 kilometers
 
Rehabilitation works, development and paving of approximately 3.5 kilometers of road, the construction of six access ramps for connection to the existing road network and to the new entrance to and exit from the city of Holon from the east, retaining walls, relocation of infrastructure, the construction of a 950-meter long culvert for the re-routing of the Azur stream.
 
Green elements:
Shredding concrete and other debris on site; using about 45,000 tons of recycled material from shredded concrete instead of C sub base and capping material. A green area close to the road was created, in which 115 trees were planted.